Port Of Tilbury- Cruise Terminal

  • Commercial & Industrial

CHC Construction were tasked with the roof refurbishment of this grade II listed building. The works included the installation of a 20,000 ft2 scaffold crash deck within the main hall to allow for the removal of the existing roof, shot blasting and respraying of the existing steel trusses. The main clock tower was also completely refurbished, including replacing all the copper panelling.

Get in touch

If you are impressed with this project and would like to work with CHC Construction, please get in touch today. Our team would love to hear about your ideas to see how we can help make them a reality.